Daily 57
Today the Breeze-KM upper stage arrived fuelled in the integration facility MIK. After lunch the adapter system with the three Swarm spacecraft was moved to the cleanroom 101 B and afterwards hoisted on the upper stage.
www.eurockot.com, 04/21/2021