Daily 21 (L-34)
The fuelling team has rearranged the Freon loading equipment today. The Swarm No.1 was moved to 101B so that Astrium can start with the fuelling preparation for the last of the three Swarm satellites this week.
www.eurockot.com, 01/15/2021