www.eurockot.com, 11/24/2017


Swarm Mission

Daily 60 (L-5)

While the Astrium team starts packing the first equipment, the upper composite (space head) was moved to the general hall, […]

Daily 59 (L-6)

Today the encapsulation of the Swarm satellites has taken place. The both fairing halves were moved from their storage position […]

Daily 58 (L-7 corrected)

Today the switch on and the electrical checks of the 3 Swarm satellites after mating with the Breeze upper stage […]

Daily 57

Today the Breeze-KM upper stage arrived fuelled in the integration facility MIK. After lunch the adapter system with the three […]

Daily 56 (L-11)

Today the launcher upper stage was fuelled with the oxidizer. After successful fuelling, the Breeze-KM upper stage will be moved […]