www.eurockot.com, 11/19/2018


Upper Composite Mated with the Boosters

Today the space head (Upper Composite) was transferred from the MIK (processing facility) to the launch pad where it was lifted and finally mated with the boosters.

In the evening this operation was followed by a successful electrical line check of the launch tower harness by Khrunichev and Thales.