www.eurockot.com, 04/22/2018


Sentinel-3B is Ready to be Mated onto the Breeze-KM Upper Stage

Yesterday the Sentinel 3B spacecraft mated with the launch vehicle adapter was hoisted and transferred to the railcar dolly. Today the dolly will be moved from clean room 101A to the clean room 101B where the fuelled upper stage was prepared and is waiting for its arrival.