www.eurockot.com, 11/24/2017


Upper composite roll-out to the launch pad and Rockot integration

Today, the upper composite was transported to the launch pad and mounted on the second stage of the rocket inside the launch tower. In the evening the spacecraft was switched on successfully. So the next big step of operations leading to the launch of Sentinel 3A has been completed.

Hoisting of the upper composite on top of the booster stages

Hoisting of the upper composite on top of the booster stages

Hoisting of the upper composite on top of the booster stages

Hoisting of the upper composite on top of the booster stages