Daily 60 (L-5)

While the Astrium team starts packing the first equipment, the upper composite (space head) was moved to the general hall, where it underwent an electrical check. Then it was prepared for the transportation to the launch pad (for example with an installation of the thermal cover) which will take place early tomorrow morning.