www.eurockot.com, 11/24/2017


Daily 57

Today the Breeze-KM upper stage arrived fuelled in the integration facility MIK. After lunch the adapter system with the three Swarm spacecraft was moved to the cleanroom 101 B and afterwards hoisted on the upper stage.

D57_P1040874_s D57_P1040883_s