www.eurockot.com, 11/21/2017


Daily 50

D50_P1040794_sToday the ESA and Astrium teams switched on the SWARM satellite FM3 and successfully checked the electrical components of the item. During the same time the upper stage of the launcher with the mounted fairings was brought to the launch pad and prepared for the electrical checks which take place tomorrow morning.