www.eurockot.com, 11/24/2017


Daily 48

D48_P1040769_sThe SWARM spacecraft flight model 2 was successfully electrically checked in 101A. At the same time the Breeze-KM upper stage was moved to the cleanroom 101B for the installation of the fairing.