www.eurockot.com, 11/21/2017


Daily 45

In the cleanroom 101A Khrunichev has prepared the interface brackets which shall be mated with the Swarm Flight Model (FM) 2 tomorrow morning.

In parallel Astrium has tested the satellite FM1. It was electrically connected via the launch vehicle adapter harness and switched on. At the same time the launcher upper stage Breeze-KM underwent preparations and pneumatical checks in the general hall.

D45_P1040728_s