Daily 44

D44_P1040699_sThe day started with the mounting of the interface brackets on the first SWARM satellite (FM1). After a visual inspection of the bottom of the satellite, a final installation of Multi- Layer Insulation (MLI) and some additional rest work, the FM1 was moved onto the SWARM launch vehicle adapter and successfully mounted in its position.