Daily 36 (L-20)

After the successful installation of the Rockot booster unit to the launch pad the operations continue in the integration facility MIK with electrical checkouts of the upper stage which is assembled with the payload fairing for the upper composite transportation dryrun. These operations in the General Hall are concluded with the attachment of the mobile air thermal control system which provides thermal conditioning of the upper stage during the transportation to the pad which is planned for tomorrow. Meanwhile, the spacecraft team is busy with closing open work on the satellites.