www.eurockot.com, 11/21/2017


Daily 33 (L-23)

During this weekend electrical checkouts of the launch vehicle are conducted to prepare the launch of the three Swarm satellites. The electrical checks are an important milestone of the launch vehicle preparations before the beginning of the joint operations with the spacecraft teams.