www.eurockot.com, 11/24/2017


Daily 30 (L-26)

Today the launch vehicle preparations for ESA Swarm mission continue with the transfer of the Transport & Launch Container Extension from the integration facility "MIK" to the Rockot launch pad using the internal rail network of the Plesetsk Cosmodrome. At the launch pad preparations are underway to conduct electrical checkouts with the launch vehicle. In the integration facility the operations continue with the second day of preparation of the payload fairing and spacecraft functional and end-to-end tests.

D30_SWARM_PLF-Cleaning_2013-10-16_small