www.eurockot.com, 11/24/2017


Daily 29 (L-27)

Snow has arrived at the Plesetsk Cosmodrome where preparation to launch ESA's Swarm continues with the pneumatic checks of the Breeze-KM upper stage and the preparation of the payload fairing for integration by Eurockot's partner Khrunichev. Meanwhile, with the spacecraft fuelling operations completed, spacecraft end-to-end tests are conducted by the Astrium team.

D29_ P1040525_s D29_3 Satellites together in Hall 101A_s