www.eurockot.com, 11/21/2017


Daily 24 (L-31)

D24_SWARM_LaunchPadVisit_2013-10-10_sThe Freon loading on the third Swarm spacecraft (FM1) continued while the other two spacecraft (FM2, FM3) underwent further functional testing. The campaign team visited today the Rockot launch pad.