www.eurockot.com, 11/24/2017


Daily 15 (L-39)

Fuelling continued in Hall 101B. The spacecraft undergo thorough checkout of its systems before and after fuelling. For this purpose the spacecraft are connected to the EGSE installed in the checkout rooms, see photos. Spacecraft No. 2 fully functional tested will be moved to Hall 101B for Freon loading operations. Spacecraft No. 1 is being prepared for functional tests.

D15_Fig1_s D15_Fig2_s