www.eurockot.com, 11/24/2017


Daily 14 (L-40)

D14_P1040345_miniToday, the three Swarm spacecraft underwent different treatments. The battery of spacecraft No. 1 was charged. A functional test was performed on spacecraft No. 2. Both spacecraft are located in clean room 101A, see photo. Freon loading was finalized today on spacecraft No. 3 which is located in the adjacent clean room 101B.