www.eurockot.com, 11/21/2017


Daily 11 (L-42)

The day at MIK started with Freon loading of the Swarm No. 3 (see Fig.1). In parallel to this activity, there is work to be carried out on the Swarm No. 2. Namely, the spacecraft batteries will be charged (see Fig.2) and abbreviated functional checks will be performed.

D11_P1040326

Fig.1: Freon loading

D11_P1040322 (2)

Fig.2: Battery charging