www.eurockot.com, 11/21/2017


Daily 10 (L-43)

While the SWARM spacecraft flight model 2 was prepared for hoisting in 101A (see figure 1), the SWARM spacecraft flight model 3 was vented and leak checked (see figure 2). This is the final preparation for SC Freon loading which starts tomorrow morning.

D10_P1040319

Figure 1

D10_P1040323

Figure 2